SANDERS

 

  • LIFETIME DISTRIBUTION CENTER

     

    Location

    Clearfield, Utah

     

    Size

    650,000 square feet

     

    Completion

    2022

     

    Design Principal

    Shane Sanders

     

    Design Team

    Steve Lund, Brooke Bean, Carly Capener, Tami Johnson

     

    Summary

    This Distribution Warehouse Facility is located on a 37-acre site that can accommodate over 63 standard vehicle parking spaces, 80 shipping and receiving truck bays with the ability to add 28 future doors, and approximately 119 truck trailer parking stalls on site.

     

    The design incorporates tilt-up concrete panels, glass, and a two-story glass atrium entrance. To allow for natural daylight, the building features 80 large clearstory windows around the perimeter wall of the building. The exterior of the building is articulated with four colors to scale down the long façades and reinforce the LIFETIME Brand. The design also incorporates sustainable design strategies such as wiring for electric vehicle charging stations in the staff parking lot and photovoltaic panels on the roof to capture energy.

     

     

     

     

     

© Copyright 2018

Sanders Associates Architects

All Rights Reserved